Back to the main page

Mailing List Logs for ShadowRN

Message no. 1
From: Brian Angliss <ANGLISS@****.PSU.EDU>
Subject: Well, here's the problem with the deck...
Date: Fri, 15 Oct 1993 00:08:18 -0400
I don't mind anyone designing the deck, but when I figured out the base cost
and design/build time, I came up with a construction cost of 1.12 million and
a street cost of 22.25 million, and a construction time of 34 years...

guess a MPCP 12 is a little high... Anybody have a better suggestion?
Brian
--meant as a light hearted smile-maker--
Message no. 2
From: The Wyrm Ouroboros <aalberdk@******.SAN.UC.EDU>
Subject: Re: Well, here's the problem with the deck...
Date: Fri, 15 Oct 1993 00:32:41 -0400
>I don't mind anyone designing the deck, but when I figured out the base cost
>and design/build time, I came up with a construction cost of 1.12 million and
>a street cost of 22.25 million, and a construction time of 34 years...
>
>guess a MPCP 12 is a little high... Anybody have a better suggestion?
> Brian

*Grins* Get a corp to do it? Let's face it, a research team would set the
construction time on its ear.....

--
Ouroboros
The (Dead) Wyrm of the .Net

Further Reading

If you enjoyed reading about Well, here's the problem with the deck..., you may also be interested in:

Disclaimer

These messages were posted a long time ago on a mailing list far, far away. The copyright to their contents probably lies with the original authors of the individual messages, but since they were published in an electronic forum that anyone could subscribe to, and the logs were available to subscribers and most likely non-subscribers as well, it's felt that re-publishing them here is a kind of public service.