Back to the main page

Mailing List Logs for ShadowRN

From: Brian Angliss <ANGLISS@****.PSU.EDU>
Subject: Well, here's the problem with the deck...
Date: Fri, 15 Oct 1993 00:08:18 -0400
I don't mind anyone designing the deck, but when I figured out the base cost
and design/build time, I came up with a construction cost of 1.12 million and
a street cost of 22.25 million, and a construction time of 34 years...

guess a MPCP 12 is a little high... Anybody have a better suggestion?
Brian
--meant as a light hearted smile-maker--

Disclaimer

These messages were posted a long time ago on a mailing list far, far away. The copyright to their contents probably lies with the original authors of the individual messages, but since they were published in an electronic forum that anyone could subscribe to, and the logs were available to subscribers and most likely non-subscribers as well, it's felt that re-publishing them here is a kind of public service.