Back to the main page

Mailing List Logs for ShadowRN

Message no. 1
From: ANGLISS BRIAN EDWARD <angliss@****.COLORADO.EDU>
Subject: All is going well
Date: Sat, 14 Oct 1995 21:16:48 -0600
*****PRIVATE: Ms. V
>>>>>[Ma'am, all is going well. The target has discovered that the
package had been removed, but not who took it. The team appears to have
been quite excellent in thier execution and covering thier tracks. Our
source has been eliminated. I took care of it personally.

I recommend that we not eliminate the team, even though some of them are
marked as targets. They were too good to just destroy without dire need,
and we could very easily require thier services again.

And the package itself has arrived at its destination, with no
difficulties. You will be receiving details from Janus on that project,
however, as the disassembly is not within my field of operations.]<<<<<
-- Avatar <21:00:20/10-14-56>

*****PRIVATE: Avatar
>>>>>[Excellent. How long before Secondary and Tertiary are
complete?]<<<<<
-- Ms. V <21:01:19/10-14-56>

*****PRIVATE: Ms. V
>>>>>[Secondary will be finished within the week.

Tertiary is proceeding better than planned, and the operatives are all in
place. They report certain unusual difficulties regarding the Astral,
but nothing other than that. They do not suspect that it will be
sufficently a problem to warrant postponement. The distractions are
proceeding nearly perfectly.

This completes my report.]<<<<<
-- Avatar <21:04:06/10-14-56>

*****PRIVATE: Ms. V
>>>>>[Professor Vector here, Ms. Velli, with an update on the package. We
have a full set of technical specifications as well as the CAD documents
and schematics. We have already begun the fabrication of some of the
long lead time parts, as well as those that can be best fabricated in
orbit. M.Aerotech has already informed us of a delivery date of
approximately 2 weeks for the prototype versions, as well as the ability
to provide a secure testbed.

I estimate approximately 6 weeks until preliminary designs are built and
ready for testing, and then another 6 months after that to integrate the
Ares design fully into our own. After that, we will be limited only by
availablity of materials and willpower.]<<<<<
-- Janus <21:12:05/10-14-56>

*****PRIVATE: Janus
>>>>>[Excellent. Keep me informed. If you have problems with any of the
other divisions, just tell me. I'll get you whatever you need. And
indeed, you should have most of those materials you require within the
next week. Maxim Aerotech will take care of the manufacturing and
fabrication, of course.

Keep up the good work, professor.]<<<<<
-- Ms. V <21:14:44/10-14-56>

Further Reading

If you enjoyed reading about All is going well, you may also be interested in:

Disclaimer

These messages were posted a long time ago on a mailing list far, far away. The copyright to their contents probably lies with the original authors of the individual messages, but since they were published in an electronic forum that anyone could subscribe to, and the logs were available to subscribers and most likely non-subscribers as well, it's felt that re-publishing them here is a kind of public service.